Canaan Inc. Has obtained a contract to deploy 4.5MW Bitcoin mining rigs in Japan. This initiative aims to enhance real-time grid load balancing, utilizing Avalon water-cooled machines.
The project, which involves a major regional utility, is expected to be operational by the end of 2025, focusing on energy optimization and effective power grid stabilization.
Leave a Reply